The picture from the previous post showed a completed floor deck on 8/2, here is what was done by 2pm that same day.
The panels ARE structural, but some window openings will still require headers. The other window openings - those not cut out yet - are field cut with an electric chainsaw with a special baseplate attachment. Then the foam is removed to a depth of 1.5" from the cut and 2x6 lumber is installed around the perimeter of the rough opening.