An online journal covering the preparation and construction of our new home. Older Posts can be accessed using the Archive links.
Wednesday, April 12, 2006
Second Floor
The roof over the master suite is not shown, nor is the bonus room over the garage. This only shows the 2nd floor living space.
The door on the stair landing is for the bonus room. The loft area delineates the kitchen below.
More messing around in MSPaint to roughly modify the jack-and-jill bathroom layout. Since I increased the size of the bath and HVAC chase, I will need to shrink the BR closets just a bit. Whatever happens, they will be sized to accept some standard size bi-fold doors.
The BR bumpouts are cantilevered over the front porch (scroll down to see elevations)
Subscribe to:
Post Comments (Atom)
2 comments:
OK Jamey - I'm ready to see some flames, some earth being moved and some building materials!! Looking forward to seeing actual progress - good luck.
Nick
Me, too! - but as you can see by the most recent post we are put off by one more month. Oh well. . . .
Post a Comment